Increasing productivity of medium voltage cable by improving overall equipment effectiveness (OEE) in PT.XYZ
This research is based on the case study in production process at PT. XYZ. The objective of this thesis is to increase output from 6.000 meters to 10.000 meters. Based on data analysis, the problem has found in the setup time that makes the assembly process inefficient and the number of machines to produce more. There are 2 steps of improvements proposed in this thesis, the first step is using Single Minutes Exchange of Die as a method, and the purpose of this method is to reduce the setup time. Another methodology that support this problem in this thesis is using Overall Equipment Effectiveness as a method for analyzing the performance on machine to get know which machine has a problem. In the end, the initial and after improved condition will be compared by Tecnomatix Plant Simulation software. Based on the final simulation results, the company is able to increase their product output from 5.753 meters to 9.960 meters.
B02984 | (Rack Thesis) | Available |
No other version available