Improving productivity in trimming x-class assembly lines by implementing line balancing methodology and motion waste reduction
This research is based on the case study in trimming assembly line in PT Mercedes-Benz Indonesia. It focuses on how line efficiency can be optimized by eliminating overwork and waste of movement so that the line can run smoothly. Based on daily report
B02452 | 2452 | (Rack Thesis) | Available |
No other version available