Analysis on the causes of late materials arrival for Australian Embassy construction project in Jakarta (a case study of PT XYZ Indonesia)
The purpose of this study is to analyze the causes of late materials arrival forrnAustralian Embassy construction project in Jakarta done by PT. XYZ Indonesia. Thisrnresearch is qualitative and using both primary and secondary data
B01938 | (Rack Thesis) | Available |
No other version available