Scheduling of AGV for 3 machines system in simulator case study with 4 types of layout
The purpose of the thesis is to develop scheduling system for AGV using a simulation and to find the number of AGV that works well with the schedule system and the layout. the schedule uses FIFO method for the job dispatch and Gantt Chart for the process timeline. Brute Force Method will be used to determine the effective number of AGV, the movement speed of AGVand dispatch interval. the simulation softwares that are used in the work are V-REP and Plant Simulation Tecnomatix. the layout configuration, distance between stations, number of AGV,speed of AGV and dispatch interval are the main factors affecting the scheduling system. the simulation gives a result report in numbers to show the effectiveness of the scheduling system. Adjustment to simulation parameters, which are the number of AGV, speed of AGV and interval dispatch, can be made to achieve better performance.rnNotes: CD error
B01596 | (Rack Thesis) | Available |
No other version available