Quality improvement by adding inspection checkpoint(s) within partial automated footwear assembly line: a TQM study via DMAIC and simulation approach at PT Panarub Industry
The primary objective of this thesis is to implement Total Quality Management viarnDMAIC (Define-Measure-Analyse-Control) methodology and simulation approach inrnPT. Panarub Industry as a part of quality improvement within the company. Therncompany is in progress to integrate automation into their assembly line through ALPArn(Assembly Line Project Automation). PT Panarub Industry introduced a performancernindicator of good quality product at the first time it is made
B01905 | (Rack Thesis) | Available |
No other version available