Analysis factor cost overrun in terms of budget allocation in management project: case study of PT. Thirthiez pilar indonesia
The purpose of this study is to analyze what factor that causes of cost overrun in every project for Thirtiez group. This research is using quantitative and using both primary and secondary data
B02182 | 2182 | (Rack Thesis) | Available |
No other version available